Lean — The 8 Wastes
8 Wastes of lean Taiichi Ohno — a Japanese Industrial Engineer, was known as the father of the Toyota Production System. While searching for better ways for process improvement and to optimize resources, Ohno identified 7 lean wastes (Muda in Japanese) of lean manufacturing (the 8th waste was added in the 90s). The 8 wastes […]